All lower levels are looking more and more like beautiful homes with party walls and internal linings installed on Levels 3 and 4, whilst the ceiling and walls on Level 1 are being finalised.
Our core walls and planters for all levels are underway.
Activity on the Ground Floor includes sanding of the walls and ceiling, as well as installation of fixtures.
Now the core structure is finalised we look forward to all those finishing touches that make Alondra Residences such a premium retirement living building.