With the concrete slabs on all levels finalised, our Ground Floor and Level 1 are beginning to take shape with installation of the internal fitout, walls and linings all commencing.
Blockwork is ongoing within the basements and the installation of slab services has begun on Level 5.
Planter boxes have been installed around Level 4 – these will be home to our gorgeous greenery that will really bring Alondra Residences to life!
The construction team are working tirelessly as the site continues to buzz with activity.

Check out this drone snap of Alondra Residences!